EDP Consulting Group Sdn Bhd
  • Our Expertise
  • Our Projects
  • Our Firm
  • Careers
  • Contact Us
×
EDP Consulting Group
Semarak20

Semarak20

  • Expertise

    Structural Engineering

  • Location

    Jalan Semarak, Kuala Lumpur, Malaysia

  • Client

    FELCRA Bhd. / WZR Property Sdn. Bhd.

  • Completion Year

    2024

  • Estimated Project Value

    Undisclosed Fee

The FELCRA Development along Jalan Semarak is a mixed development also known as Semarak20 which consist of 1 block of 35-storey Grade A office tower, 1 block of 43-storey serviced apartment, 7-storey of elevated car park, 1-storey of facility floor, 4-storey of basement car park along with 6-storey of commercial block. The mixed development along Jalan Semarak is under the Federal Land Consolidation and Rehabilitation Authority (FELCRA), a corporate organization under the Ministry of Finance, Malaysia. EDP Consulting Group Sdn. Bhd. is involved in providing consulting engineering for an intricate list of structural services which includes the elevated car park, serviced apartment commercial block and office tower.

 

Technical Description

The elevated car park and commercial block structure were designed using reinforced concrete conventional beam and slab system while the office tower was designed using post-tensioned flat slab system. Part of the requirement for the office tower within the mixed development was to have all columns located along the perimeter of the tower in order to provide the tenants with a spacious and “columnless” office floor. This particular arrangement will contribute towards an optimized usage of the floor area within the office tower. One of the highlights for the structural design of the tower is, the raker column design. The office tower columns are also designed using high strength concrete, Grade 60. Steel structures are used for glass canopy structures and the link bridge. The glass canopy is a cantilever structure with a tie-back of 8.8m. The link bridge is made up of concrete-steel composite system which spans over an approximate length of 18m. The link bridge consists of 200mm thick reinforced concrete slab and supported by 4 numbers of universal main beam.

Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20
Semarak20

Our Projects

The Exchange 106

The Exchange 106

The Exchange 106 Kuala Lumpur
Parcel F Government Complex

Parcel F Government Complex

Parcel F Government Complex Putrajaya
IOI City Mall

IOI City Mall

IOI City Mall Selangor
Kuantan Port

Kuantan Port

Kuantan Port Pahang
Setiawangsa – Pantai Expressway (SPE)

Setiawangsa – Pantai Expressway (SPE)

Setiawangsa – Pantai Expressway (SPE) Kuala Lumpur
Sungai Besi – Ulu Klang Expressway (SUKE)

Sungai Besi – Ulu Klang Expressway (SUKE)

Sungai Besi – Ulu Klang Expressway (SUKE) Kuala Lumpur
Tun Razak Exchange (TRX), Malaysia’s International Financial Centre – 70 Acres

Tun Razak Exchange (TRX), Malaysia’s International Financial Centre – 70 Acres

Tun Razak Exchange (TRX), Malaysia’s International Financial Centre – 70 Acres Kuala Lumpur
Angsana Teluk Bahang by Banyan Tree

Angsana Teluk Bahang by Banyan Tree

Angsana Teluk Bahang by Banyan Tree Penang
Bandar Malaysia – 486 Acres

Bandar Malaysia – 486 Acres

Bandar Malaysia – 486 Acres Kuala Lumpur
Pulau Melaka

Pulau Melaka

Pulau Melaka Malacca
Pengerang Deepwater Terminal (PDT)

Pengerang Deepwater Terminal (PDT)

Pengerang Deepwater Terminal (PDT) Johor
Penang South Reclamation (PSR)

Penang South Reclamation (PSR)

Penang South Reclamation (PSR) Penang
Johor Bahru – Singapore Rapid Transit System (RTS)

Johor Bahru – Singapore Rapid Transit System (RTS)

Johor Bahru – Singapore Rapid Transit System (RTS) Johor
Kota Seri Langat Development – 2,888 Acres

Kota Seri Langat Development – 2,888 Acres

Kota Seri Langat Development – 2,888 Acres Selangor
Ideal Reclamation

Ideal Reclamation

Ideal Reclamation Penang
CIMB Headquarters

CIMB Headquarters

CIMB Headquarters Kuala Lumpur
Bukit Jalil Parcel A, Aurora Place

Bukit Jalil Parcel A, Aurora Place

Bukit Jalil Parcel A, Aurora Place Kuala Lumpur
Encorp Marina

Encorp Marina

Encorp Marina Johor
Pantai Hospital Kuala Lumpur

Pantai Hospital Kuala Lumpur

Pantai Hospital Kuala Lumpur Kuala Lumpur
Mid Valley Tower of Light

Mid Valley Tower of Light

Mid Valley Tower of Light Kuala Lumpur
MBMR Tower

MBMR Tower

MBMR Tower Kuala Lumpur
Hino Motors Manufacturing Plant

Hino Motors Manufacturing Plant

Hino Motors Manufacturing Plant Negeri Sembilan
Gravit8

Gravit8

Gravit8 Selangor
Gamuda Cove Water Theme Park

Gamuda Cove Water Theme Park

Gamuda Cove Water Theme Park Selangor
Semarak20

Semarak20

Semarak20 Kuala Lumpur
National Energy Centre

National Energy Centre

National Energy Centre Selangor
TRX North South Bridge (Contract C9)

TRX North South Bridge (Contract C9)

TRX North South Bridge (Contract C9) Kuala Lumpur
TRX Vehicular Tunnel (Contract C3)

TRX Vehicular Tunnel (Contract C3)

TRX Vehicular Tunnel (Contract C3) Kuala Lumpur
The Mall, Mid Valley Southkey

The Mall, Mid Valley Southkey

The Mall, Mid Valley Southkey Johor
The Gardens Mall

The Gardens Mall

The Gardens Mall Kuala Lumpur
Prudential Headquarters

Prudential Headquarters

Prudential Headquarters Kuala Lumpur
Jelutong Reclamation

Jelutong Reclamation

Jelutong Reclamation Penang
Gas District Cooling Plant 4

Gas District Cooling Plant 4

Gas District Cooling Plant 4 Putrajaya
Core Residence

Core Residence

Core Residence Kuala Lumpur
Banyan Tree Kuala Lumpur

Banyan Tree Kuala Lumpur

Banyan Tree Kuala Lumpur Kuala Lumpur
Sunway Citrine

Sunway Citrine

Sunway Citrine Johor
Affin Bank & HSBC Headquarters

Affin Bank & HSBC Headquarters

Affin Bank & HSBC Headquarters Kuala Lumpur
PJ8

PJ8

PJ8 Selangor
Dialog Tower

Dialog Tower

Dialog Tower Selangor

EDP CONSULTING GROUP SDN BHD

Contact Us

Useful Link

  • Our Expertise
  • Our Project
  • Our Firm
  • Careers

Follow Us

  • instagram
  • linkedin
  • facebook

Copyright © 2022 EDP Consulting Group Sdn Bhd